Steel mesh tied over plastic membrane in a formed up driveway, with a worker on the reoSide path formed up with membrane and steel mesh laid, worker in hi vis at the far endMini excavator digging out the ground in front of a house before the formwork goes inLong path formed up with timber edges, membrane and steel mesh before the pourSide of house formed up with membrane and mesh ready for concrete
Driveways
Driveway poured and taped off, with the work ute and trailer parked on the streetFreshly poured driveway running from the house down to the streetLong driveway poured down to the kerbWide driveway and slab poured on a corner block
Exposed aggregate
Exposed aggregate driveway leading up to a double garage on a new home
Slabs
Shed slab poured beside a house with the shed already standing
Patios
Slab poured along the side of a house next to the pool fenceCourtyard slab poured between two brick walls at the back of a houseCourtyard slab finished up to the back door
Paths
Side path poured the full length of the house beside the fenceSide path poured between the house and the timber fencePath freshly poured and finished along a brick wallFront path poured from the gate to the house